China Boilers and Control Panel Manufacturer - CN Boiler
English
Projects

Thermal Energy Industry

Boiler Project: 3 Sets 1.6MPa (about 232psi) of 52.5MW Gas Fired Hot Water Boiler

Control System: DCS Control

Location: Henan province,China

Equipment: Boilers/power cabinets/DCS control system/water pumps(feedwater/circulation water)/fans/burners/deaerator/water treatment devices/heating exchanger units,etc.

Description: Xinzheng Heating company is mainly responsible for the heating business in Xinzheng City during the heating season every year.

How are hot water boilers used for heating?

Hot water boiler heating requires a complete heat exchange system, using hot water in the form of "water-water heat exchange" for heating. The water-water heat exchange process uses heat exchangers to heat water, and then circulates hot water for heating. The hot water from boiler passes through the thermal cycle of the plate heat exchanger to heat the heating water, then it cooled water, and then return to the hot water boiler for continuous heating. The plate heat exchanger does not need electricity for heating.

Why can we win the bid for this project?

Some people say that obtaining the latest bid information is the first step, but our company believes that it is the first step to contact Party A from the beginning of the project plan. In the early stage, we need to gain the trust of customers a little bit, and use our expertise to provide customers with some suggestions on the contents of the bidding for its reference.

Next, share some key factors of why we won the bid.

1) Collect information, analyze and research. Many bidding projects need to be tracked for a long time before they can finally win the bid. Therefore, it is key to do a good job in research and intelligence data collection and analysis. Every bidding staff stays up late every day just to see through the project.

2) Use our professional knowledge and rich experience to provide suggestions for some common blind areas of detailed knowledge, so that customers know what is necessary and what is inevitable, so as to understand the project more thoroughly.

3) Study the bidding project and quote carefully. Every detail of the bidding must be controlled in place, and the quotation must be reasonable. After the final bidding plan is finalized, the technical team will carefully check it three times on the big screen in the meeting room, and after confirming that it is correct, the bid will be sealed and handed over.and so on.

 

If you want to know more bidding skills, you can contact us, and we will tell you more about the small experience of the boiler project.

Contact Us Now
Advanced Cookie Settings
Essential Cookies
These cookies enable core functionality such as security, verification of identity and network management. These cookies can’t be disabled.
Enable Marketing Cookies
These cookies are used to track advertising effectiveness to provide a more relevant service and deliver better ads to suit your interests.
Enable Functional Cookies
These cookies collect data to remember choices users make to improve and give a more personalised experience.
Enable Analytics Cookies
These cookies help us to understand how visitors interact with our website, discover errors and provide a better overall analytics.
Save
accept cookies
reject all
Setting
We use cookies to make the website work, to provide advanced features, social media and traffic analysis, and we use analytics and third-party advertising cookies. If you choose to click "Deny All", you will retain the default setting of not allowing the use of cookies or other tracking tools other than technical tools.
China Boilers and Control Panel Manufacturer - CN Boiler
No. 16 Jinzhan Street, High and New Technology Development Zone, Zhengzhou City
You can trust us
We are a professional Manufacturer in China, and we are constantly innovating so that our customers can have better products and services.
Contact Us
© 2023 CN Boiler        SiteMap.html    SiteMap.xml    Terms of Service      Privacy Policy
Marketing Support by Globalsir
Enter your inquiry details, We will reply you in 24 hours.
Name can't be empty
E-mail can't be empty
Company can't be empty
Phone can't be empty
Products can't be empty
Message can't be empty
Verification code error
code
Clear